
Projects can comply with the performance requirement in one of three ways:
1. The building is recertified on a two-year cycle using LEED for Existing Buildings: Operations & Maintenance.
2. The building provides energy and water usage data on an on-going basis annually.
3. The building owner signs a release that authorizes USGBC to access the building’s energy and water usage data directly from the building’s utility provider.
The requirement creates a data stream on LEED-certified building performance that can be used by owners and operators to optimize their building performance and promote the establishment of energy efficiency goals over the life of the building.





![2610_LightNow_Archlight_Banner Ad_900x400 | LightNOW Dallas Market Center ArcLight Summit banner: Call for Speakers, June 22–23, 2027 — Apply Now (logo with colorful arc.”] ,](https://i0.wp.com/www.lightnowblog.com/wp-content/uploads/2026/10/2610_LightNow_Archlight_Banner-Ad_900x400-e1792264459229.png?fit=900%2C400&ssl=1)


You must be logged in to post a comment.