
Projects can comply with the performance requirement in one of three ways:
1. The building is recertified on a two-year cycle using LEED for Existing Buildings: Operations & Maintenance.
2. The building provides energy and water usage data on an on-going basis annually.
3. The building owner signs a release that authorizes USGBC to access the building’s energy and water usage data directly from the building’s utility provider.
The requirement creates a data stream on LEED-certified building performance that can be used by owners and operators to optimize their building performance and promote the establishment of energy efficiency goals over the life of the building.





You must be logged in to post a comment.